Sunday, September 21, 2008

sunday sept 21

here's the front of the house- the deck is in, no steps, needs to be treated. the sun/moon we bought at hyde park street fair is gracing the front of the house-looks good!




















wiring is done, plumbing & hvac inspections done. waiting on the electrical inspection.


















the framing was moved, so now we have a small closet in the bedroom, and the bathroom door moved over.

















steve and john took sheetrock for the upstairs ceiling today, so they can get the ceiling up & the insulation shot. they had a great time hauling it upstairs, and can't wait to do the same for the wall sheetrock (not!) steve brought back the shower stall that wouldn't meet code (tho for some reason he was able to buy it at home depot) to return.

we'll be in austin next weekend, be a few weeks before we have another update.

No comments: